[1]
Tsai, C.-F. and Lin, F.-C. 2014. A NEW HYBRID HEURISTIC TECHNIQUE FOR SOLVING JOB-SHOP SCHEDULING PROBLEM. International Journal of Computing. 3, 3 (Aug. 2014), 93-99. DOI:https://doi.org/10.47839/ijc.3.3.310.